• Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)
  • Sany DN125 Concrete pump hardened pipe (45Mn2)

Sany DN125 Concrete pump hardened pipe (45Mn2)

  • USD $50.5 - $59.9 / Piece Get Latest Price
  • Chunda
  • DN125 5''
  • Hebei, China
  • 1 Piece / Pieces
  • T/T L/C D/P D/A MoneyGram Credit Card PayPal
  • 1000 Piece / Pieces per Month
  • Tianjin xingang port
Packaging Details PP woven bag and plastic cap, as per clients'request
Product Description

1. Hebei Chunda Pipe Fitting Manufacturing Co.,Ltd is a trading and manufacturer of combination.

2. Established in 2000.

3. Business Field: concrete pump pipe, elbow, reducer, bend, rubber hose, piston, wear plate, cutting ring, etc.

4. We have been exporting to more than 30 countries. They are Russia, philippines, Australia, India, Vietnam, Jordan, etc.

5. Company sence

6. Production Equipment

7. Our professional service team

Product Description

 Concrete pump hardened pipe (45Mn2/55Mn)

  • Material: 45Mn2 / 55Mn
  • Wall Thickness: 4.5/ 5.0/ 7.0mm
  • Length: 1m, 2m, 3m, or according to client's requirements
  • Complete with SK 148mm twin wall flange, HD, PM ZX 175mm, Schwing MF 166mm, Sany 157mm, Zoomlion ZX etc.
  • Welding technique: automatic welding
  • Surface Treatment: powder painted and baked
  • Working Pressure: SK type: 85-120 bar         ZX type: over 130 bar
  • Hardness: 58-62 HRC ( 55Mn: up to 65 HRC)
  • Life Time: 30,000-35,000 CBM in China, 40,000-45,000 CBM in Korea. It is subject to the influence of various factors
  • Package: plastic caps and woven bags, according to client's request.
  • Type of lading: in bulk or 10 pcs in bundle
  • Loading quatity of different containers: 20GP: 200-270pcs

                                                                             40GP: 500-550pcs

  • Delivery Time: 20GP: 8-10 days

                                     40GP: 10-15 days

  • Terms of payment: T/T, L/C, etc

Inspection certificate of concrete pump hardened pipe

Hardened pipe raw material

Type of Flange

Production Progress

Welding Contrast

Surface Contrast

Types of lading

Container loading

Connection Items for Pipes

Other Spare Parts

Contact us                                                  

Hebei Chunda Pipe Fitting Manufacturing Co., Ltd.

We Provide

concrete pump spare parts ,concrete pump parts ,concrete pump pipe ,concrete pump elbow ,concrete pump

Main Markets

Eastern Asia , Mid East , Oceania , Africa , Southeast Asia , Eastern Europe , South America , North America

Contact Now

Sourcing Request

Submit